Zydus gets EIR for injectables manufacturing facility at Zydus Biotech Park

The inspection had concluded with NIL observations

Zydus Lifesciences has received the EIR report from the USFDA for the inspection conducted at the injectables manufacturing facility at Zydus Biotech Park located at Changodar, Ahmedabad from June 5-13, 2023.

The inspection was a cGMP Inspection and had ended with NIL observations.

cGMP InspectionEIR reportinjectables manufacturing facilityUSFDAZydus Biotech ParkZydus Lifesciences
Comments (0)
Add Comment